Location

The proposed site, approximately 130 kilometres north of Adelaide, is well placed to capture and export solar energy into the national electricity grid from the nearby Mintaro substation and its existing 132kV transmission line to Waterloo.

Always looking for the best emplacement

  • This site was selected because of its proximity to grid infrastructure, good drainage and largely cleared land. The level of solar irradiation also makes it a suitable site for a solar farm.